Revision as of 19:13, 25 November 2026 by Montagonist (talk | contribs) (Created page with "The '''Connecticut River Line''' is the railroad along the Connecticut River through Montague City, Montague, running from Springfield to East Northfield. It is owned by MassDOT and operated for freight by the Berkshire & Eastern Railroad. Amtrak's ''Vermonter'' runs on the line but does not stop in Montague. == Construction == The line was built by the '''Connecticut River Railroad''', formed in 1845 by the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The Connecticut River Line is the railroad along the Connecticut River through Montague City, Montague, running from Springfield to East Northfield. It is owned by MassDOT and operated for freight by the Berkshire & Eastern Railroad. Amtrak's Vermonter runs on the line but does not stop in Montague.

Construction

[edit]

The line was built by the Connecticut River Railroad, formed in 1845 by the merger of the Northampton & Springfield Railroad and the Greenfield & Northampton Railroad. It opened from Springfield to Northampton in 1845, was extended to Deerfield in the summer of 1846, and reached Greenfield on November 23, 1846; on January 1, 1849 it opened to South Vernon, Vermont, meeting the Vermont & Massachusetts Railroad.

Under the Boston & Maine

[edit]

The Connecticut River Railroad was leased to the Boston & Maine Railroad in 1893 (a 99-year lease from March 1, 1893) and became part of Guilford Rail System, later Pan Am Railways, in 1983. There was no station at Montague City on the Connecticut River Line itself; the Montague City station belonged to the Turners Falls Branch, not this line.

MassDOT buys the line

[edit]

MassDOT owns the line today, having bought the Springfield-to-East Northfield line (about 50 miles) for $17 million. The purchase was agreed in July 2012 and finalized on August 20, 2014, with the acquisition recorded as completed in 2015. Pan Am Southern retained a permanent, exclusive freight operating easement.

The 2012–2014 rebuild

[edit]

The line was rebuilt in 2012–14 with about $73 million in federal funds and $10 million from the state: about 95,000 ties replaced, 49 miles of continuously welded rail, new signals, warning devices at 23 public and 4 private crossings, and six bridge upgrades. Passenger speed reaches 79 mph on long straight sections between Hatfield and Deerfield. Before the rebuild, freight had dwindled to very little and the line was operated at low speed, with freight limited to 10 mph.

Passenger service ends; the Vermonter

[edit]

Most local passenger service on the line ended on June 14, 1959, and through passenger trains were cut on September 6, 1966. Amtrak's Vermonter was rerouted onto the line on December 29, 2014, stopping at Northampton and Greenfield; a Holyoke stop was added on August 27, 2015. The nearest stops to Montague are Greenfield (John W. Olver Transit Center) to the north and Northampton to the south. The Valley Flyer (Greenfield–New Haven) serves the same Massachusetts stops; it began on August 31, 2019 as a pilot and was made permanent in October 2022.

Freight today

[edit]

Freight service is operated by the Berkshire & Eastern Railroad, which also dispatches and operates the line on behalf of MassDOT; Berkshire & Eastern took over Pan Am's operations on the line in September 2023. East Deerfield Yard, across the river in Deerfield and Greenfield and not in Montague, is the major yard feeding the line; MassDOT cut the ribbon on a $5.6 million intermodal upgrade there on July 21, 2026.