Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Michael Henry's Montague Matters, a Community Resource
Search
Search
Appearance
Create account
Log in
Personal tools
Not logged in
Talk
Contributions
Create account
Log in
Editing
Connecticut River Line
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
The '''Connecticut River Line''' is the railroad along the Connecticut River through [[Montague City, Massachusetts|Montague City]], [[Montague, Massachusetts|Montague]], running from Springfield to East Northfield. It is owned by MassDOT and operated for freight by the Berkshire & Eastern Railroad. Amtrak's ''Vermonter'' runs on the line but does not stop in Montague. == Construction == The line was built by the '''Connecticut River Railroad''', formed in 1845 by the merger of the Northampton & Springfield Railroad and the Greenfield & Northampton Railroad. It opened from Springfield to Northampton in 1845, was extended to Deerfield in the summer of 1846, and reached Greenfield on '''November 23, 1846'''; on January 1, 1849 it opened to South Vernon, Vermont, meeting the Vermont & Massachusetts Railroad. == Under the Boston & Maine == The Connecticut River Railroad was leased to the Boston & Maine Railroad in 1893 (a 99-year lease from March 1, 1893) and became part of Guilford Rail System, later Pan Am Railways, in 1983. There was no station at Montague City on the Connecticut River Line itself; the Montague City station belonged to the [[Turners Falls Branch]], not this line. == MassDOT buys the line == MassDOT owns the line today, having bought the Springfield-to-East Northfield line (about 50 miles) for '''$17 million'''. The purchase was agreed in July 2012 and finalized on August 20, 2014, with the acquisition recorded as completed in 2015. Pan Am Southern retained a permanent, exclusive freight operating easement. == The 2012–2014 rebuild == The line was rebuilt in 2012–14 with about $73 million in federal funds and $10 million from the state: about 95,000 ties replaced, 49 miles of continuously welded rail, new signals, warning devices at 23 public and 4 private crossings, and six bridge upgrades. Passenger speed reaches 79 mph on long straight sections between Hatfield and Deerfield. Before the rebuild, freight had dwindled to very little and the line was operated at low speed, with freight limited to 10 mph. == Passenger service ends; the Vermonter == Most local passenger service on the line ended on June 14, 1959, and through passenger trains were cut on September 6, 1966. Amtrak's ''Vermonter'' was rerouted onto the line on '''December 29, 2014''', stopping at Northampton and Greenfield; a Holyoke stop was added on August 27, 2015. The nearest stops to Montague are Greenfield (John W. Olver Transit Center) to the north and Northampton to the south. The Valley Flyer (Greenfield–New Haven) serves the same Massachusetts stops; it began on August 31, 2019 as a pilot and was made permanent in October 2022. == Freight today == Freight service is operated by the '''Berkshire & Eastern Railroad''', which also dispatches and operates the line on behalf of MassDOT; Berkshire & Eastern took over Pan Am's operations on the line in September 2023. East Deerfield Yard, across the river in Deerfield and Greenfield and not in Montague, is the major yard feeding the line; MassDOT cut the ribbon on a $5.6 million intermodal upgrade there on July 21, 2026. == See also == * [[Railroads in Montague]] * [[Turners Falls Branch]] * [[Canalside Rail Trail]] * [[Montague City, Massachusetts]] * [[History timeline]] == Sources == * Connecticut River Line — Wikipedia. https://en.wikipedia.org/wiki/Connecticut_River_Line * Connecticut River Railroad — Wikipedia. https://en.wikipedia.org/wiki/Connecticut_River_Railroad * Railway and Locomotive Historical Society, Bulletin No. 32 (1933). https://archive.org/stream/sim_railroad-history_1933_32_0/sim_railroad-history_1933_32_0_djvu.txt * MassDOT, State Rail Plan, Spring 2018. https://www.mass.gov/doc/final-state-rail-plan-spring-2018/download * Surface Transportation Board, Docket No. FD 35863, MassDOT Acquisition Exemption (decided October 21, 2014). https://public-inspection.federalregister.gov/2014-25346.pdf?1414068677 * Trains in the Valley, "Connecticut River Main Line" (updated August 1, 2024). https://trainsinthevalley.org/connecticut-river-main-line/ * Railway Station Lists (UK), "Southern New England Railroads (1)," SL 197, July 30, 2022. https://railwaystationlists.co.uk/pdfs/pdfusarr/southernnewenglandrrs1.pdf * Vermonter (train) — Wikipedia. https://en.wikipedia.org/wiki/Vermonter_(train) * MassDOT, "MassDOT Hosts Ribbon Cutting to Celebrate Completion of East Deerfield Rail Yard Intermodal Project," July 21, 2026. https://www.mass.gov/news/massdot-hosts-ribbon-cutting-to-celebrate-completion-of-east-deerfield-rail-yard-intermodal-project
Summary:
Please note that all contributions to Michael Henry's Montague Matters, a Community Resource are considered to be released under the Creative Commons Attribution-ShareAlike 4.0 International (see
Montague matters:Copyrights
for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource.
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Connecticut River Line
Add topic